
Engine and Powerplant DER Services
Prime Propulsion is your go-to partner for piston and turbine engine PMA DER consulting and powerplant repair DER liaison services. We aim to deliver airtight compliance matrices to accelerate every approval milestone. Whether you’re developing a new PMA for fuel nozzles, or accessory gearbox parts—or seeking major repair or repair specifications—our in-house DER brings insider FAA experience to minimize comments and cut review cycles by up to 40%. From identicality PMA and material life-cycle testing through DER-witnessed first-article inspections and follow-on support, we manage every technical and regulatory step so you can focus on engineering innovation and production ramp-up. Choose Prime Propulsion for specialized engine and powerplant DER consulting that transforms complex FAA requirements into streamlined, service-ready solutions.

Services
-
PMA & Major Repair, and repair specifications approvals for turbine engines, auxiliary power units, accessories, piston engines, fuel systems, etc.
-
DER-authored Test & Computations, test plans, and hand calculations per AC 21-303 App. A
-
First-Article Inspection and NACIP support for proposed PMA Articles
-
On-site client support for test witnessing
-
DER-led identicality studies for legacy and derivative engine parts
-
Material compatibility and life-cycle testing plans (creep, fatigue, corrosion)
-
Locate and contract required laboratories as needed to perform testing
-
Powerplant and Engine ATC, STC, and TC support.
-
Post-approval troubleshooting and support
-
DER-led SOP and PMA-pathway workshops for in-house teams
Key Deliverables
-
Compliance matrix tailored to Part 23, Part 25, and Part 33 regulations.
-
DER issue-resolution briefings, pre-submission package audits.
-
Full-service FAA package assembly and on-going support as needed.
-
DER-witnessed dimensional/functional checks per NACIP
-
Drawings, BOMs, tolerance stacks, project management
Case Studies
-
Turbine fuel nozzle - PMA in 10 months, 20% cost savings
-
Viton O-rings - PMA in 5 months, 60% cost savings
-
Accessory bearing - PMA in 7 months, 30% cost savings
-
Aircraft fuel pump shaft - PMA in 8 months, 25% cost savings
-
Accessory repair - Prevented scrapping of 40% of components by installing sleeve.
Why Prime Propulsion?
-
Built on our DER’s pre-submission “dry runs,” our clients routinely see FAA acceptance in 30–40% less time compared to industry averages—getting your parts into service (and revenue) sooner.
-
Exclusive engine/APU expertise versus generalist consultancies
-
One-stop engine/powerplant portfolio management from design through field return.
-
Averaging over 25 Powerplant and engine component PMAs per year, including many submissions with zero comments.
-
Flat-fee scoping and modular service bundles—choose exactly the deliverables you need (e.g., Review Only, Package assembly, or full-package with drawings and lab reports)—so you avoid surprise overages.
-
FAA Powerplant Engineer, extensive experience reviewing PMAs from the lenses of the FAA.
Contact us to Schedule your free Engine & Powerplant DER consultation